NBK Keyport Building 489/105
Work was to install 2 each 20-ton Liebert Glycol/DX Computer room AC split systems with Humidity Control in the existing facility and remove the old defunct equipment.
Work was to install 2 each 20-ton Liebert Glycol/DX Computer room AC split systems with Humidity Control in the existing facility and remove the old defunct equipment.