Work was to install 2 each 20-ton Liebert Glycol/DX Computer room AC split systems with Humidity Control in the existing facility and remove the old defunct equipment.
Work was to install 2 each 20-ton Liebert Glycol/DX Computer room AC split systems with Humidity Control in the existing facility and remove the old defunct equipment.
Work was to provide and install a new DATA AIRE split system DX Computer Room Air Conditioning Unit in the Server Room of Building 1101.
This project was to remove and existing oversize Computer Room Air Conditioning Unit that was severely short cycling and replace with 2 new smaller lead lag systems with auto change over.
Precision Cooling and Climate control for the remote switching unit for JBLM. Consisted of DX cooling Unit/Dry Cooler Combinations designed by the Corps, with Heat recovery ventilators. A Design Build Seismically certified Chiller/ Chilled Water unit was added.