Work was a welding exhaust system, along with a HVAC system & DDC controls for the Olympic College Shelton Campus Welding Shop.
Work was a welding exhaust system, along with a HVAC system & DDC controls for the Olympic College Shelton Campus Welding Shop.
Project is removing 8 large FRP Fans serving the ventilation system for the Dip Tanks, replace failed wheels and re-balance the remainder, replace the Bearings and shaft seals, then reinstall the fans.
Work was to provide a design build HVAC and ventilation system for the Baker Lake fish Trap for multiple structures including the floating fish trap.
Miller Sheetmetal preformed the installation of the vehicle exhaust fans and silencers for the WSDOT project.