Harbor side Park Fountains, Bremerton, WA
The Harbor side park fountains were completed in 2007, Miller Sheetmetal fabricated and installed the custom copper skins over the concrete structure along with fabricating and installing the stainless-steel waterworks basins.
The Harbor side park fountains were completed in 2007, Miller Sheetmetal fabricated and installed the custom copper skins over the concrete structure along with fabricating and installing the stainless-steel waterworks basins.